翻訳と辞書
Words near each other
・ Turis Fratyr
・ Turisanus
・ Turisas
・ Turisas2013
・ Turiscai
・ Turismo
・ Turismo Carretera
・ Turismo Carretera (video game)
・ Turismo Pilipina 2008
・ Turismod
・ Turist
・ Turist Ömer
・ Turistas
・ Turistens klagan
・ Turitea
Turitea Wind Farm
・ Turivar
・ Turiwára
・ Turiwára language
・ Turiy Peninsula
・ Turiya
・ Turiya Hanover
・ Turiyananda
・ Turið Elinborgardóttir
・ Turið Sigurðardóttir
・ Turiúba
・ Turić
・ Turići
・ Turiška Vas na Pohorju
・ Turiška Vas, Slovenj Gradec


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Turitea Wind Farm : ウィキペディア英語版
Turitea Wind Farm

Turitea Wind Farm is a proposed wind farm being developed by Mighty River Power (MRP) for the Palmerston North District Council. Most of the land is located in the Turitea Reserve, near Turitea, in Palmerston North, New Zealand. The project was initially planned for 131 wind turbines〔(【引用サイトリンク】title=Planned Wind Farm Has Nine Less Turbines )〕 with a capacity of over 300 MW,〔(【引用サイトリンク】publisher=Mighty River Power )〕 with final approval of 60 turbines or 180 MW.〔
The wind farm is proposed for land owned by the Palmerston North District Council. In 2005 and following a competitive bid process, the Council selected MRP to develop the project.
== Consent process ==
MRP applied for resource consents for 131 turbines in 2008,〔(【引用サイトリンク】title=Turitea Wind Farm AEE )〕 and later applied to the Environment Minister for the project to be called in under the RMA. The call in process can result in faster processing of major projects, but in this case it coincided with the 2008 election and change of government. The Palmerston North City Council decided to continue with processing of the application, despite MRP's application for call-in.〔(【引用サイトリンク】publisher=Manawatu Standard )
In December 2008, the Minister for the Environment, Nick Smith, directed that the project be called in〔(【引用サイトリンク】title=Ministerial direction for call in )〕 and the Board of Inquiry invited submissions and commenced sitting in 2009.〔(【引用サイトリンク】title=Mighty River Power’s proposal for a wind farm at Turitea )〕 The hearing adjourned for a period in 2009, to enable MRP to redesign the proposal, reducing it to 104 turbines.〔 In 2010, the Board resumed the hearing, with a draft decision in February 2011 permitting 61 turbines.〔
In 2011, the Board issued its final decision, approving a wind farm of 60 turbines, up to 3MW each.〔 In October 2011, Mighty River Power stated in its annual report that the Turitea Wind Farm was not likely to be economically viable before 2015.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Turitea Wind Farm」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.